Official Gazette on self-consumption and net billing
The core PV and storage framework is in force.
This page separates confirmed regulation, pending decisions, and the practical checks you still need before ordering.
Sunrail checks the process before final equipment order.
The chronology keeps the official rule, landlord or building approval, and the still-open items separate.
The core PV and storage framework is in force.
The notification idea is public, but we do not treat it as final without the written text.
Sunrail waits until the balcony, the owner, and the official procedure all line up.
As of 9 June 2026, Greece has an official self-consumption and net-billing framework, plus a public policy direction for plug-in balcony PV up to 800 W. The specific simple-notification flow with HEDNO/DEDDIE should still be checked against the final written procedure before equipment is ordered.
| Status | What it means | Source |
|---|---|---|
| Confirmed | An official decision exists for self-consumption, synchronized offsetting, collective self-consumption, and storage. | Ministry Gazette B 5074/2024 |
| Confirmed | HEDNO/DEDDIE is the electronic-application and grid-connection body for PV systems on the distribution network. | HEDNO PV FAQ |
| Pending | Simple digital notification for plug-in balcony PV up to 800 W has been publicly reported but must be checked against the final text and platform. | To Vima / OT as context |
| Needs review | Railing, shade, wiring, apartment-building rules, and local planning constraints are not solved by marketing copy. | Practical check |
Photo, direction, shade, mounting, and cable route.
Cross-check HEDNO, Ministry sources, and building requirements.
Final setup only when supplier and documentation are locked.
Install and notify according to the official flow.
The sources below show what is official and what remains pending.