Greek rules for balcony solar

This page separates confirmed regulation, pending decisions, and the practical checks you still need before ordering.

Rules status
General net billingOfficial Gazette
800 W balcony PVPublicly announced
HEDNO flowFinal text checked before order

Sunrail checks the process before final equipment order.

What changed, when, and what still needs a check

The chronology keeps the official rule, landlord or building approval, and the still-open items separate.

Allowed now
Standard self-consumption flow
HEDNO/DEDDIE handles the ordinary process under the official framework.
Ask for written approval
Rental units or shared surfaces
If you change a railing, facade, drilling point, or common area, you need permission before ordering.
Still pending
The plug-in 800 W flow
The public direction exists, but the final written flow must match before equipment is bought.
2024-09

Official Gazette on self-consumption and net billing

The core PV and storage framework is in force.

2026-04

Public discussion of a simpler 800 W plug-in path

The notification idea is public, but we do not treat it as final without the written text.

Today

Final check before ordering

Sunrail waits until the balcony, the owner, and the official procedure all line up.

Short answer

As of 9 June 2026, Greece has an official self-consumption and net-billing framework, plus a public policy direction for plug-in balcony PV up to 800 W. The specific simple-notification flow with HEDNO/DEDDIE should still be checked against the final written procedure before equipment is ordered.

StatusWhat it meansSource
ConfirmedAn official decision exists for self-consumption, synchronized offsetting, collective self-consumption, and storage.Ministry Gazette B 5074/2024
ConfirmedHEDNO/DEDDIE is the electronic-application and grid-connection body for PV systems on the distribution network.HEDNO PV FAQ
PendingSimple digital notification for plug-in balcony PV up to 800 W has been publicly reported but must be checked against the final text and platform.To Vima / OT as context
Needs reviewRailing, shade, wiring, apartment-building rules, and local planning constraints are not solved by marketing copy.Practical check

Review the place

Photo, direction, shade, mounting, and cable route.

Review the rules

Cross-check HEDNO, Ministry sources, and building requirements.

Lock equipment

Final setup only when supplier and documentation are locked.

Proceed

Install and notify according to the official flow.